2017


Steel Sperons Secchia River

Period
2016 - 2020

Specifications and Details

Structural Designer: Ing. Alfonso Corredor
Architectural Designer: Altene ingegneria
Customer: AIPo ufficio operativo di Modena
Interventions Completed: Structural project of 17 spurs in metallic steel corten of selective bridle of the river Secchia.

Gallery